Freight limits imposed after defects found in Hawkesbury River rail bridge

By Jacob Saulwick
Updated December 2 2016 - 2:08pm, first published 1:59pm
Belated investigations in 2015 showed significant corrosion on a pier supporting the Hawkesbury River Rail Bridge. Subsequent investigations have shown corrosion in its upper sections. Photo: Marina Neil
Belated investigations in 2015 showed significant corrosion on a pier supporting the Hawkesbury River Rail Bridge. Subsequent investigations have shown corrosion in its upper sections. Photo: Marina Neil

Limits are being imposed on freight trains running over the rail bridge connecting Sydney with the Central Coast and Newcastle, after engineering reports found cracking in the bridge's concrete and "consistent defects" in its steel frame.

Subscribe now for unlimited access.

$0/

(min cost $0)

or signup to continue reading

See subscription options

Get the latest Tamworth news in your inbox

Sign up for our newsletter to stay up to date.

We care about the protection of your data. Read our Privacy Policy.